File #: 25-584    Version: 1 Name:
Type: Agreement Status: Agenda Ready
File created: 5/29/2025 In control: BOARD OF SUPERVISORS
On agenda: 6/10/2025 Final action:
Title: Consideration of Change Order #1 to the Construction Contract with Weeks Drilling & Pump Co., for the Spring Valley Test Wells in the amount of $133,400.00 and Authorize the Administrator to Sign the Contracts
Sponsors: Special Districts
Attachments: 1. 16300 Pueblo Trail Change Order #1
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Memorandum

 

Date:                                          June 10, 2025

 

To:                                          The Honorable Eddie Crandell, Chair, Lake County Board of Supervisors

 

From:                                          Robin Borre, Special Districts Administrator

 

Subject:                     Consideration of Change Order #1 to the Construction Contract with Weeks Drilling & Pump Co., for the Spring Valley Test Wells in the amount of $133,400.00 and Authorize the Administrator to Sign the Contracts

 

Executive Summary: The district has received a grant for additional water supplies for Spring Valley.  The funding is to install one well in Spring Valley.  A test well must be drilled to ensure adequate water is found and to ensure that it meets state requirements related to water quality.  Weeks Drilling and Pump Co. was awarded the initial Test Well contract on March 25, 2025. 

 

Weeks Drilling we hit water at about 300 feet providing about 100 gallons per minute (gpm).  Due to the rock formations and drilling conditions, it was beneficial to drill deeper to increase the gpm.  Weeks drilled to 560 feet and hit two different aquafers producing at least 200 gpm in total.  The current plant produces about 180 to 200 gpm.  The additional drilling cost is reflected in the attached Change Order in the amount of $133,400.  This additional cost is covered by grant funding and no additional funds are needed to award the Change Order. 

 

Upon completion of the test wells, additional bids will be solicited to complete the production wells, connect them to the water system and install all necessary equipment.  There is sufficient funding in the grant to complete the production well.

 

If not budgeted, fill in the blanks below only:

Estimated Cost: __   Amount Budgeted: __ Additional Requested: ______ Future Annual Cost: ___ 

 

Purchasing Considerations (check all that apply):                                           Not applicable

Fully Article X. <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI>- and/or Consultant Selection Policy <http://lcnet.co.lake.ca.us/Assets/Intranet/Policy/Policies+$!26+Procedures+Manual/Ch4_2021v2.pdf>-Compliant (describe process undertaken in “Executive Summary”)                     

Section 2-38 <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI> Exemption from Competitive Bidding (rationale in “Executive Summary,” attach documentation, as needed)                     

For Technology Purchases: Vetted and Supported by the Technology Governance Committee <http://lcnet.co.lake.ca.us/Assets/Intranet/Intranet+Forms/Information+Technology/AdvPlan.pdf> (“Yes,” if checked)

Other (Please describe in Executive Summary)

 

Consistency with Vision 2028 <http://www.lakecountyca.gov/Government/Directory/Administration/Visioning/Vision2028.htm> (check all that apply):                                                                Not applicable

Well-being of Residents                                           Public Safety                                                                Disaster Prevention, Preparedness, Recovery                     

Economic Development                                           Infrastructure                                                                County Workforce                     

Community Collaboration                      Business Process Efficiency                      Clear Lake                                                               

 

Recommended Action: Award Change Order #1 to the Construction Contract with Weeks Drilling & Pump Co., for the Spring Valley Test Wells in the amount of $133,400.00 and Authorize the Administrator to Sign the Contracts.