Title: Approve a Deed Notification Covenant for an Environmental Restriction on a Portion of Lampson Field and Authorize the Chair to Sign
Sponsors: Public Works
Attachments: 1. Deed Notification Covenant, 2. map, 3. grant deed and draft report
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Memorandum

 

 

Date:                                          September 15, 2020

 

To:                                          The Honorable Moke Simon, Chair, Lake County Board of Supervisors

 

From:                                          Scott De Leon, Public Works Director

                     

Subject:                     Approve a Deed Notification Covenant for an Environmental Restriction on a Portion of Lampson Field and Authorize the Chair to Sign.

 

Executive Summary: (include fiscal and staffing impact narrative):

In December, 2018 the Department of Public Works (DPW) was required by the Central Valley Regional Water Quality Control Board to conduct a Closure Evaluation Report (Report) on property at the airport.  This property was the former site of a fixed-base operator at the airport called Air Power, Inc., which operated at the site from 1977 to 2009.  This site has been the subject of extensive evaluation, monitoring and mitigation efforts since 1995.  The Report was the result of groundwater testing performed by the state in 2017 and 2018, which showed continued presence of contamination of the groundwater.  DPW hired a consultant to prepare the Report, and they have recommended the recordation of a Deed Notification Covenant to reduce the risk of exposure to residual contamination in the future.  I have attached a copy of the draft Report for your information, along with a copy of the proposed Covenant.

 

This Covenant will only apply to a portion of the overall property at Lampson Field, which is illustrated on the attached map, and it simply restricts the use of groundwater to non-consumptive uses only.                                               

 

If not budgeted, fill in the blanks below only:

Estimated Cost: ________ Amount Budgeted: ________ Additional Requested: ________ Future Annual Cost: ________ 

 

Consistency with Vision 2028 and/or Fiscal Crisis Management Plan (check all that apply):                                           Not applicable

Well-being of Residents                                           Public Safety                                                                Infrastructure                                           Technology Upgrades

Economic Development                                           Disaster Recovery                                           County Workforce                      Revenue Generation

Community Collaboration                      Business Process Efficiency                      Clear Lake                                           Cost Savings                                          

If request for exemption from competitive bid in accordance with County Code Chapter 2 Sec. 2-38, fill in blanks below:

Which exemption is being requested?

How long has Agreement been in place? 

When was purchase last rebid?

Reason for request to waive bid?

 

Recommended Action: