File #: 23-665    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 6/5/2023 In control: BOARD OF SUPERVISORS
On agenda: 6/13/2023 Final action:
Title: Consideration of Change Order #1 Cooper Creek Bridge at Witter Springs Road, Federal Project No. BRLO-5914(078); Bid No. 22-03, with West Coast Contractors, for an increase of $6,062.61 and a revised contract amount of $1,496,872.35 and authorize the Chair to sign
Sponsors: Public Works
Attachments: 1. CCO#1 Cooper at Witter - for BOS Sig

Memorandum

 

 

Date:                                          June 5, 2023

 

To:                                          The Honorable Lake County Board of Supervisors

 

From:                                          Scott De Leon, Public Works Director

 

Subject:                     Consideration of Change Order #1 Cooper Creek Bridge at Witter Springs Road, Federal Project No. BRLO-5914(078); Bid No. 22-03, with West Coast Contractors, for an increase of $6,062.61 and a revised contract amount of $1,496,872.35 and authorize the Chair to sign

 

Executive Summary:

 

Attached for the Board’s review and approval is Contract Change Order (CCO) 1 for the subject project. 

 

Fencing on the West side of the bridge project was found to have been changed by the property owners after the project designs were completed to enable the property owners to raise small livestock on the property. The plans called for the property owners fence to be removed and replaced with a Barbed Wire Fence, which would not prevent small livestock from escaping the fence. The contractor was directed to replace the fencing “in-kind”, which resulted in this change order.

 

Contract Change Order No. 1 addresses the costs associated with the change in fencing materials and an increase cost of labor to construct the fence. These items resulted in an increase of $6,062.61 to the original contract amount of $1,492,809.74 for a new contract amount of $1,498,872.35. Caltrans has concurred that the costs are reasonable and eligible for reimbursement.

 

This project is fully funded by the Federal Highway Administration (FHWA) thru Federal Highway Bridge Program (HBP) funds and California Toll Credit funds. Therefore, this project is 100% federally and state funded thru construction.

 

 

If not budgeted, fill in the blanks below only:

Estimated Cost: ________ Amount Budgeted: ________ Additional Requested: ________ Future Annual Cost: ________ 

 

Purchasing Considerations (check all that apply):                                           Not applicable

Fully Article X. <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI>- and/or Consultant Selection Policy <http://lcnet.co.lake.ca.us/Assets/Intranet/Policy/Policies+$!26+Procedures+Manual/Ch4_2021v2.pdf>-Compliant (describe process undertaken in “Executive Summary”)                     

Section 2-38 <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI> Exemption from Competitive Bidding (rationale in “Executive Summary,” attach documentation, as needed)                     

For Technology Purchases: Vetted and Supported by the Technology Governance Committee <http://lcnet.co.lake.ca.us/Assets/Intranet/Intranet+Forms/Information+Technology/AdvPlan.pdf> (“Yes,” if checked)

Other (Please describe in Executive Summary)

 

Consistency with Vision 2028 <http://www.lakecountyca.gov/Government/Directory/Administration/Visioning/Vision2028.htm> (check all that apply):                                                                Not applicable

Well-being of Residents                                           Public Safety                                                                Disaster Prevention, Preparedness, Recovery                     

Economic Development                                           Infrastructure                                                                County Workforce                     

Community Collaboration                      Business Process Efficiency                      Clear Lake                                                               

 

Recommended Action:  Approve Change Order #1 Cooper Creek Bridge at Witter Springs Road, Federal Project No. BRLO-5914(078); Bid No. 22-03, with West Coast Contractors, for an increase of $6,062.61 and a revised contract amount of $1,496,872.35 and authorize the Chair to sign.