Memorandum
Date: July 29, 2025
To: The Honorable Lake County Board of Supervisors
From: Lars Ewing, Interim Public Works Director
Subject: Consideration of an Update on the Cobb Area Road Rehabilitation Project (2024 Pavement Rehabilitation Project) and Possible Direction to Staff to Modify the Agreement Between the County of Lake and Argonaut Constructors for the 2024 Pavement Rehabilitation Project to Include Asphalt Paving for Roads Previously Planned to be Double Chip Sealed at an Estimated Additional Cost of $1,100,000
Executive Summary:
On April 8, 2025, the County entered into a $5.1 million road reconstruction contract with Argonaut Constructors, which included pulverization of the existing road surfaces in the Cobb area, followed by a chip seal surface application for many roads, as well as pulverization and a hot mix asphalt surfacing for other roads.
As construction has proceeded this summer, residents have raised concerns the chip seal surfacing is not sufficient to meet durability and quality expectations.
To evaluate these concerns, Public Works staff requested the final design report from Nichols Consulting Engineers (NCE), the firm contracted by the County to prepare the design for this project. NCE submitted that report July 23, 2025, which summarizes the engineering and decision-making process undertaken with former County staff that led to the development of recommendations for this project, including a recommendation many roads be surfaced with a double chip seal. NCE has been asked to attend this presentation to provide information and respond to questions regarding the engineering approach and decision-making process for road rehabilitation.
Concerns remain regarding the long-term durability of the chip sealed roads and the best available investment decisions for County Road Maintenance funds. Staff evaluated options to improve the roads that have been pulverized but did not receive asphalt surfacing. Options considered include an additional seal coat, use of the County roads crew for additional maintenance, or asphalt paving by contract.
After careful consideration, staff recommends amending the contract with Argonaut Constructors, to include asphalt paving
The estimated additional cost for upgrading the surface treatment from chip seal to asphalt paving is approximately $1,000,000. Supervisor Pyska has expressed willingness to commit $225,000 in Cannabis discretionary funding. In preparation for your Board’s Tuesday discussion, staff are likewise exploring options for the estimated remaining total of $875,000.
If not budgeted, fill in the blanks below only:
Estimated Cost: ________ Amount Budgeted: ________ Additional Requested: ________ Future Annual Cost: ________
Purchasing Considerations (check all that apply): ☐ Not applicable
☐ Fully Article X. <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI>- and/or Consultant Selection Policy <http://lcnet.co.lake.ca.us/Assets/Intranet/Policy/Policies+$!26+Procedures+Manual/Ch4_2021v2.pdf>-Compliant (describe process undertaken in “Executive Summary”)
☐ Section 2-38 <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI> Exemption from Competitive Bidding (rationale in “Executive Summary,” attach documentation, as needed)
☐ For Technology Purchases: Vetted and Supported by the Technology Governance Committee <http://lcnet.co.lake.ca.us/Assets/Intranet/Intranet+Forms/Information+Technology/AdvPlan.pdf> (“Yes,” if checked)
☐ Other (Please describe in Executive Summary)
Consistency with Vision 2028 <http://www.lakecountyca.gov/Government/Directory/Administration/Visioning/Vision2028.htm> (check all that apply): ☐ Not applicable
☒ Well-being of Residents ☒ Public Safety ☒ Disaster Prevention, Preparedness, Recovery
☐ Economic Development ☒ Infrastructure ☐ County Workforce
☐ Community Collaboration ☐ Business Process Efficiency ☐ Clear Lake
Recommended Action:
Direction to staff to proceed with modifying the Agreement Between the County of Lake and Argonaut Constructors for the 2024 Pavement Rehabilitation Project to Include Asphalt Paving for Roads Previously Planned to be Double Chip Sealed at an Estimated Additional Cost of $1,100,000.