File #: 25-1206    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 12/9/2025 In control: BOARD OF SUPERVISORS
On agenda: 12/16/2025 Final action:
Title: Consideration of Contract Change Order No. 3 to the contract with Argonaut Constructors, Inc. for the 2024 Pavement Rehabilitation Project for an increase of $311,850.00; and Authorize the Chair to sign
Sponsors: Public Works
Attachments: 1. Lake County Pavement Rehabilitation CCO 03 - LE signed
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Memorandum

 

 

Date:                                          December 16, 2025

 

To:                                          The Honorable Lake County Board of Supervisors

 

From:                                          Lars Ewing, Interim Public Works Director

 

Subject:                     Consideration of Contract Change Order No. 3 to the contract with Argonaut Constructors, Inc. for the 2024 Pavement Rehabilitation Project for an increase of $311,850.00; and Authorize the Chair to sign

 

 

Executive Summary:

 

On April 8, 2025, your Board entered into a contract with Argonaut Constructors for the pulverization of approximately 16 miles of roads in the Cobb area, followed by either a chip seal surface application or a hot mix asphalt (HMA) surfacing, depending on the roadway segment.

 

On September 9, 2025, your Board approved a contract change order to modify the scope by replacing the planned chip seal surfaces with asphalt concrete on roads that had already been pulverized and chip sealed under the original contract. The asphalt quantities for that change order were calculated using an estimated 2-inch HMA overlay. However, once construction began, field conditions revealed that several roads had surfaces that were highly irregular, with extensive rutting and distortion. In many areas, achieving a uniform, structurally sound, and drivable surface required the placement of asphalt at depths between 2.5 and 3 inches. As a result, the paving quantities exceeded the prior estimate by approximately 1,450 tons, and the paving budget was exhausted before the contractor could complete the four remaining roads within the project scope.

 

Proposed Change Order No. 3 requests additional funding to complete the remaining work based on field conditions encountered throughout the project. Funding for this change order is available within the Road Maintenance and Rehabilitation Account apportionments, and there are sufficient capital appropriations in Budget Unit 3011, Roads.

 

Approval of Change Order No. 3 will increase the contract by $311,850.00, resulting in a revised contract amount of $6,453,941.38. This remains well below the original construction estimate of $8,929,115.61.

 

 

 

If not budgeted, fill in the blanks below only:

Estimated Cost: ________ Amount Budgeted: ________ Additional Requested: ________ Future Annual Cost: ________ 

 

Purchasing Considerations (check all that apply):                                           Not applicable

Fully Article X. <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI>- and/or Consultant Selection Policy <http://lcnet.co.lake.ca.us/Assets/Intranet/Policy/Policies+$!26+Procedures+Manual/Ch4_2021v2.pdf>-Compliant (describe process undertaken in “Executive Summary”)                     

Section 2-38 <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI> Exemption from Competitive Bidding (rationale in “Executive Summary,” attach documentation, as needed)                     

For Technology Purchases: Vetted and Supported by the Technology Governance Committee <http://lcnet.co.lake.ca.us/Assets/Intranet/Intranet+Forms/Information+Technology/AdvPlan.pdf> (“Yes,” if checked)

Other (Please describe in Executive Summary)

 

Consistency with Vision 2028 <http://www.lakecountyca.gov/Government/Directory/Administration/Visioning/Vision2028.htm> (check all that apply):                                                                Not applicable

Well-being of Residents                                           Public Safety                                                                Disaster Prevention, Preparedness, Recovery                     

Economic Development                                           Infrastructure                                                                County Workforce                     

Community Collaboration                      Business Process Efficiency                      Clear Lake                                                               

 

Recommended Action: 

 

 

Approve Contract Change Order No. 3 to the contract with Argonaut Constructors, Inc. for the 2024 Pavement Rehabilitation Project for an increase of $311,850.00, and authorize the Chair to sign