Legislation Details

File #: 26-0609    Version: 1 Name:
Type: Report Status: Agenda Ready
File created: 6/3/2026 In control: Lake County Sanitation District
On agenda: 6/9/2026 Final action:
Title: 11:00 A.M. - (Sitting as the LACOSAN Board of Directors) Consideration of Request for Quarterly Report of LACOSAN Infrastructure Status
Sponsors: Bruno Sabatier
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Memorandum

 

 

Date:                                          June 9, 2026

 

To:                                          The Honorable LACOSAN Board of Directors

 

From:                                          Bruno Sabatier, District 2 Supervisor

 

Subject:                     (Sitting as the LACOSAN Board of Directors) Consideration of Request for Quarterly Report of LACOSAN Infrastructure Status

 

Executive Summary:

 

LACOSAN operates the Southeast Regional Wastewater System, Northwest Regional Wastewater System, Middletown Wastewater System, Anderson Springs Sewer, and South Lakeport Wastewater Service.

 

Many of the systems are aging with most being around 30+ years old.  Some systems, some more than others, deal with wet season inflow and infiltration that increases the amount of effluent going into the treatments ponds doubling sometimes tripling the amount seen during dry seasons.

 

As the Board is aware, there have been a number of large spills that have occurred in the Southeast Regional Wastewater System, as well as other less significant spills in the other systems.

 

Due to increasing climate unpredictability, which is enhanced by more intensified precipitation, our wastewater systems are being tested more and more.  It is important for the LACOSAN Board to have the knowledge of the systems’ status in order to make better decisions on resource priorities to mitigate system issues.

 

Here is a sample of a quarterly report:

Quarterly report for each system should include:

-                     Inspections:

o                     # of linear feet of gravity pipeline inspection using smoke testing and camera work

o                     # of linear feet of forcemain inspection

o                     # Valve Inspections

o                     # Odor Control Inspections

o                     # Lift Station Inspections

o                     # of issues found

o                     Resolution and timeline for fixes required for issues found and potential cost

-                     Maintenance

o                     # of complaints for maintenance received

o                     # of pro-active maintenance

o                     Type of maintenance that occurred (i.e. unclog roots, unclog fat, clean out dirt, pipe replacement, pipe expansion)

-                     Spills

o                     Number of gallons spilled

o                     Type of spill

o                     Reason for spill

o                     Fix to resolve spill

-                     Sewer Pond

o                     Maximum daily gallons during time period

o                     Minimum daily gallons during time period

 

I am asking the Board to approve receiving a quarterly report such as this to keep us apprised of the status of our LACOSAN wastewater systems.  The first report would start in October 2026, for what has occurred in the past three months from July 1, 2026 - September 30, 2026.

 

 

If not budgeted, fill in the blanks below only:

Estimated Cost: ___N/A___ Amount Budgeted: ___N/A_____ Additional Requested: _N/A_____ Future Annual Cost: __N/A____ 

 

Purchasing Considerations (check all that apply):                                           Not applicable

Fully Article X. <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI>- and/or Consultant Selection Policy <http://lcnet.co.lake.ca.us/Assets/Intranet/Policy/Policies+$!26+Procedures+Manual/Ch4_2021v2.pdf>-Compliant (describe process undertaken in “Executive Summary”)                     

Section 2-38 <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI> Exemption from Competitive Bidding (rationale in “Executive Summary,” attach documentation, as needed)                     

For Technology Purchases: Vetted and Supported by the Technology Governance Committee <http://lcnet.co.lake.ca.us/Assets/Intranet/Intranet+Forms/Information+Technology/AdvPlan.pdf> (“Yes,” if checked)

Other (Please describe in Executive Summary)

 

Consistency with Vision 2028 <http://www.lakecountyca.gov/Government/Directory/Administration/Visioning/Vision2028.htm> (check all that apply):                                                                Not applicable

Well-being of Residents                                           Public Safety                                                                Disaster Prevention, Preparedness, Recovery                     

Economic Development                                           Infrastructure                                                                County Workforce                     

Community Collaboration                      Business Process Efficiency                      Clear Lake                                                               

 

Recommended Action: Approve the request for a LACOSAN systems quarterly report to the Board.