Title: Approve Amendment Two to the Agreement with Staten Solar Corporation for Design, Installation, and Commissioning of Energy Conservation Facilities Serving the Lake County Courthouse Campus, and authorize the Chair to sign
Sponsors: Public Services
Attachments: 1. Amendment Two_Staten_CHSolar, 2. Amend_CHSolar_PS Amend 1 Executed, 3. County of Lake - Staten Agreement (20240109 executed)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Memorandum

 

 

Date:                                          March 3, 2026

 

To:                                          The Honorable Brad Rasmussen, Lake County Board of Supervisors

 

From:                                          Lars Ewing, Public Services Director

 

Subject:                     Approve Amendment Two to the Agreement with Staten Solar Corporation for Design, Installation, and Commissioning of Energy Conservation Facilities Serving the Lake County Courthouse Campus

 

Executive Summary

 

On January 9, 2024, your Board approved an energy conservation agreement with Staten Solar Corporation for the design, installation, and commissioning of carport solar panels at the main courthouse campus parking lot, as well as six electric vehicle (EV) charging stations.

 

The project has reached substantial completion and is operational. However, during construction several field conditions and coordination requirements required modifications to fully implement the originally approved project objectives.

 

This proposed amendment represents the final reconciliation and closeout modification to incorporate additional work performed during construction that was necessary to deliver the intended project. The additional work includes the following:

 

                     Increased column heights and footing depths

                     Installation of one additional ADA-accessible EV charging station

                     Installation of additional conduit and stubs to accommodate future EV expansion

                     PG&E fees for main EV panel and transformer

                     Engineering coordination and design refinements

 

The original contract amount was $2,284,131.00 and the amendment adds $85,600.44 for a revised contract total of $2,369,731.44. This represents a 3.75% increase over the original contract value. Funding for this amendment is available within the previously approved project budget in Budget Unit 1778. No additional appropriation is required.

 

 

If not budgeted, fill in the blanks below only:

Estimated Cost:________  Amount Budgeted: ________ Additional Requested: ________ Future Annual Cost: ________ 

 

Purchasing Considerations (check all that apply):                                           Not applicable

Fully Article X. <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI>- and/or Consultant Selection Policy <http://lcnet.co.lake.ca.us/Assets/Intranet/Policy/Policies+$!26+Procedures+Manual/Ch4_2021v2.pdf>-Compliant (describe process undertaken in “Executive Summary”)                     

Section 2-38 <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI> Exemption from Competitive Bidding (rationale in “Executive Summary,” attach documentation, as needed)                     

For Technology Purchases: Vetted and Supported by the Technology Governance Committee <http://lcnet.co.lake.ca.us/Assets/Intranet/Intranet+Forms/Information+Technology/AdvPlan.pdf> (“Yes,” if checked)

Other (Please describe in Executive Summary)

 

Consistency with Vision 2028 <http://www.lakecountyca.gov/Government/Directory/Administration/Visioning/Vision2028.htm> (check all that apply):                                                                Not applicable

Well-being of Residents                                           Public Safety                                                                Disaster Prevention, Preparedness, Recovery                     

Economic Development                                           Infrastructure                                                                County Workforce                     

Community Collaboration                                           Business Process Efficiency                      Clear Lake                     

 

 

Recommended Action:  Approve Amendment Two to the Agreement with Staten Solar Corporation for Design, Installation, and Commissioning of Energy Conservation Facilities Serving the Lake County Courthouse Campus, and authorize the Chair to sign