Legislation Details

File #: 26-0930    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 9/15/2026 In control: BOARD OF SUPERVISORS
On agenda: 9/22/2026 Final action:
Title: (Sitting as the Lake County Watershed Protection District Board of Directors) Approve a $200,000 Engineering Advance to Pacific Gas and Electric Company (PG&E) for Preliminary Engineering Associated with Transmission Tower Modifications for the Middle Creek Restoration Project and Authorize the Water Resources Director to Sign Related Documents
Sponsors: Water Resources, Lake County Watershed Protection District
Attachments: 1. Middle Creek Restoration-Dist. Deposit Ltr Nov.2019
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Memorandum

 

 

Date:                                          September 22, 2026

 

To:                                          The Honorable Lake County Board of Supervisors

 

From:                                          Dr. Pawan Upadhyay, Water Resources Director and

                                          Michael Bedar, Water Resources Program Coordinator

 

Subject:                     (Sitting as the Lake County Watershed Protection District Board of Directors) Approve a $200,000 Engineering Advance to Pacific Gas and Electric Company (PG&E) for Preliminary Engineering Associated with Transmission Tower Modifications for the Middle Creek Restoration Project and Authorize the Water Resources Director to Sign Related Documents

 

Executive Summary:

 

The Middle Creek Restoration Project requires modification and/or relocation of existing Pacific Gas and Electric Company (PG&E) electrical infrastructure within the project area. As previously presented to the Board on December 12, 2023 (File No. 23-1338), the project includes seven PG&E transmission towers, as well as distribution facilities that may be affected by implementation of the restoration project. At that time, the Board approved allocation of $200,000 from Cannabis Tax revenues for the PG&E engineering deposit needed to advance the project.

 

PG&E has now provided an updated Engineering Advance request dated August 6, 2026. PG&E anticipates that the first $200,000 Engineering Advance (EA) will fund preliminary modeling and limited design development for modifications to seven transmission towers, likely advancing the design to no more than approximately 30 percent. PG&E has advised that additional Engineering Advances, currently estimated at approximately $400,000 to $800,000, may be required to complete the engineering phase; these amounts remain preliminary and will be refined as PG&E develops the scope of work. PG&E currently estimates the overall tower-modification portion of the project at approximately $3.5 million to $7.0 million.

 

PG&E cannot begin the preliminary engineering work until it receives the signed Engineering Advance letter and the $200,000 deposit. Once the relocation design and associated costs are developed, PG&E anticipates that an Actual Cost Agreement and additional funding will be required before construction of the utility modifications can proceed.

 

Advancing PG&E's engineering work at this time is important to maintaining progress on the Middle Creek Restoration Project and coordinating utility modifications with the broader project design and implementation schedule. Other ongoing project activities include the U.S. Army Corps of Engineers' validation study of the original project, development of project cost information, and continued property acquisition and appraisal activities.

 

Approval of the Engineering Advance will allow PG&E to begin preliminary engineering and develop more refined design requirements and cost estimates necessary for subsequent phases of the Middle Creek Restoration Project.

 

 

If not budgeted, fill in the blanks below only:

Estimated Cost: ________ Amount Budgeted: ________ Additional Requested: ________ Future Annual Cost: ________ 

 

Purchasing Considerations (check all that apply):                                           Not applicable

Fully Article X. <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI>- and/or Consultant Selection Policy <http://lcnet.co.lake.ca.us/Assets/Intranet/Policy/Policies+$!26+Procedures+Manual/Ch4_2021v2.pdf>-Compliant (describe process undertaken in “Executive Summary”)                     

Section 2-38 <https://library.municode.com/ca/lake_county/codes/code_of_ordinances?nodeId=COOR_CH2AD_ARTXPU_S2-38EXCOBI> Exemption from Competitive Bidding (rationale in “Executive Summary,” attach documentation, as needed)                     

For Technology Purchases: Vetted and Supported by the Technology Governance Committee <http://lcnet.co.lake.ca.us/Assets/Intranet/Intranet+Forms/Information+Technology/AdvPlan.pdf> (“Yes,” if checked)

Other (Please describe in Executive Summary)

 

Consistency with Vision 2028 <http://www.lakecountyca.gov/Government/Directory/Administration/Visioning/Vision2028.htm> (check all that apply):                                                                Not applicable

Well-being of Residents                                           Public Safety                                                                Disaster Prevention, Preparedness, Recovery                     

Economic Development                                           Infrastructure                                                                County Workforce                     

Community Collaboration                      Business Process Efficiency                      Clear Lake                                                               

 

Recommended Action:  (Sitting as the Lake County Watershed Protection District Board of Directors) Approve a $200,000 Engineering Advance to Pacific Gas and Electric Company (PG&E) for Preliminary Engineering Associated with Transmission Tower Modifications for the Middle Creek Restoration Project and Authorize the Water Resources Director to Sign Related Documents.