Skip to main content
File #: 25-998    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 10/2/2025 In control: Planning Commission
On agenda: 10/9/2025 Final action:
Title: 9:05a.m. PUBLIC HEARING - Consideration of Major Use Permit (UP 23-03/ PL-25-63) for a 150’ tall monopole wireless communication tower within a 50’ x 50’ lease area containing support equipment for the tower; Location: 6720 Leslie Place, Lucerne (APN: 006-003-01); Applicant: Vertical Bridge (VB BTS II, LLC)
Sponsors: Community Development
Attachments: 1. Site Plans, 2. COA, 3. IS.MND with recirculation memo, 4. Bio Report, 5. Arborists and Tree Protection Plan, 6. Simulation and Coverage Maps, 7. Agency Comments, 8. Public Comment, 9. Staff Report
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Memorandum


Date: October 9, 2025

To: The Honorable Lake County Board of Supervisors

From: Mireya G. Turner, Director
Prepared by: Trish Turner, Associate Planner


Subject: Consideration of Major Use Permit (UP 23-03/ PL-25-63) for a 150' tall monopole wireless communication tower within a 50' x 50' lease area containing support equipment for the tower; Location: 6720 Leslie Place, Lucerne (APN: 006-003-01); Applicant: Vertical Bridge (VB BTS II, LLC)

Executive Summary:

Consideration for a Major Use Permit (UP 23-03/ PL-25-63) to construct a new 150' tall monopine cell tower designed to look like a pine tree including 12 antennas, one MW antenna, six RRUS, one GPS antenna, two ground-mounted radio cabinets and 50' by 50' lease area to house equipment needed to support the tower. The lease area will be enclosed by a 6' tall chain link fence. The applicant attempted to co-locate the facility but was not able to find an existing tower within this area that would allow co-location. The applicant is proposing some tree removal for widening the access road to the tower.

Recommended Action:

Staff recommends the Planning Commission take the following actions:

A. Adopt Initial Study (IS 23-07/ PL-25-63) for Major Use Permit (UP 23-03/ PL-25-63) with the following findings:

1. Potential impacts to Aesthetics can be mitigated to 'less than significant' levels with the inclusion of mitigation measure AES-1 through AES-3.

2. Potential impacts to Air Quality can be mitigated to less than significant levels with the inclusion of mitigation measures AQ-1 and AQ-2.

3. Potential environmental impacts related to Biological Resources can be mitigated to less than significant with the inclusion of mitigation measure BIO-1 through BIO-3.

4. Potential environmental impacts related to Cultural Resources can be mitigated to less than significant levels by mitigation measures CUL-1 through CUL-3.

5. Potential impacts to geological and soil resources can be mitiga...