Legislation Details

File #: 26-0858    Version: 1 Name:
Type: Ordinance Status: Agenda Ready
File created: 8/17/2026 In control: BOARD OF SUPERVISORS
On agenda: 9/15/2026 Final action:
Title: 9:45 A.M. - PUBLIC HEARING – Consideration of Draft Ordinance to Amend Article VI to Chapter 9 of the Lake County Code Establishing a Cross-Connection Control Program to Protect the Public Water Systems
Sponsors: Special Districts
Attachments: 1. Amending Ord 1462 Cross Connection Control Policy -Revised 9-4-26 Signed
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Memorandum


Date: September 15, 2026

To: The Honorable Lake County Board of Supervisors

From: Robin Borre, Special Districts Administrator

Subject: PUBLIC HEARING – Consideration of Draft Ordinance to Amend Article VI to Chapter 9 of the Lake County Code Establishing a Cross-Connection Control Program to Protect the Public Water Systems

Executive Summary:

County of Lake Special Districts is proposing amendments to its existing Cross-Connection Control Program Ordinance to align with the requirements and terminology established in the California State Water Resources Control Board’s Cross-Connection Control Policy Handbook (CCCPH).
The amendments update existing language, definitions, requirements, and procedures to reflect current State standards for the prevention of backflow and protection of the public drinking water supply.
These revisions are intended to maintain consistency with State requirements, strengthen the District’s existing cross-connection control program, and ensure continued protection of the District’s public water systems.
The proposed amendments primarily update and clarify the existing program rather than establish a new Cross-Connection Control Program.
If not budgeted, fill in the blanks below only:
Estimated Cost: 0 Amount Budgeted: 0 Additional Requested: 0 Future Annual Cost: 0

Purchasing Considerations (check all that apply): ? Not applicable
? Fully Article X.- and/or Consultant Selection Policy-Compliant (describe process undertaken in “Executive Summary”)
? Section 2-38 Exemption from Competitive Bidding (rationale in “Executive Summary,” attach documentation, as needed)
? For Technology Purchases: Vetted and Supported by the Technology Governance Committee (“Yes,” if checked)
? Other (Please describe in Executive Summary)

Consistency with Vision 2028 (check all that apply): ? Not applicable
? Well-being of Residents ? Public Safety ? Disaster Prevention, Prepa...

Click here for full text