Staff Report
Date: January 25, 2024
To: Planning Commission
From: Mireya G. Turner, Director
Michelle Irace, Principal Planner
Prepared by: Eric Porter, Associate Planner
Subject: Consideration of a one-year extension (UPX 23-02), to Major Use Permit (UP 21-18); Applicant: Sunrise Shore Mutual Water Company / Brelje Engineering; Location: 6030 Sunrise Court and 6200 Sunrise Drive, Lower Lake (APNs: 043-302-04 and 043-310-05)
Executive Summary:
Consideration of a one-year extension to Major Use Permit (UP 21-18) for the expansion of and improvements to a water production facility. A Mitigated Negative Declaration (file no. IS 21-19) was completed for the project in 2021.
The two lots are developed with an aging water treatment plant in need of upgrades. The two existing 15,000-gallon redwood water tanks are leaking and need to be removed and replaced along with the concrete pads that support them. The catch basin under the filtration system is faulty and must be replaced along with the concrete pad beneath. The facility's water demand and amount of potable water storage needed has also increased, and the applicant is proposing two 45,000-gallon water tanks to replace the aging 15,000-gallon redwood tanks.
Recommended Action:
Staff recommends the Planning Commission take the following actions:
A. Approve the one-year extension for Major Use Permit (UP 21-18) with the following findings:
1. That the proposed extension is not classified as a project under CEQA section 15060(c)(1) through (3), and no additional environmental review is necessary to approve this extension.
2. That the establishment, maintenance, or operation of the use applied for will not under the circumstances of the particular case, be detrimental to the health, safety, morals, comfort and general welfare of the persons residing or working in the neighborhood of such proposed use or be detrimental to property and improvements in the neighborhood or the general welfare of t...