File #: 18-949    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 10/23/2018 In control: BOARD OF SUPERVISORS
On agenda: 11/6/2018 Final action:
Title: (Continued from October 23, 2018) Approve Amendment Eight to the Agreement for Engineering Services for Four (4) Bridge Replacement Projects and Two (2) Bridge Rehabilitation Projects in Lake County, CA, with Quincy Engineering, Inc. in the amount not to exceed $1,370,973.05 (an increase of $6,965.59) and authorize the Chair to sign
Sponsors: Public Works
Attachments: 1. Amend8Quincy
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Body
MEMORANDUM

TO: Board of Supervisors
FROM: Scott De Leon, Public Works Director
DATE: November 6, 2018
SUBJECT: Approve Amendment Eight to the Agreement for Engineering Services for Four (4) Bridge Replacement Projects and Two (2) Bridge Rehabilitation Projects in Lake County, CA, with Quincy Engineering, Inc. in the amount not to exceed $1,370,973.05 (an increase of $6,965.59), and authorize the Chair to sign

EXECUTIVE SUMMARY:

On September 27, 2011, the Department of Public Works entered into an Agreement with Quincy Engineering, Inc. for Engineering Services for Four (4) Bridge Replacement Projects and Two (2) Bridge Rehabilitation Projects in Lake County, CA. The Agreement was modified by Modification One and Amendments One thru Seven to allow for the completion of extra work which was required during the design phase and to extend the term of the Agreement.
Cast-in-drilled-hole (CIDH) piles were installed by the contractor at Robinson Creek Bridge at Mockingbird Lane. Gamma-Gamma Logging (GGL) testing, required to be performed prior to the acceptance of the CIDH piles, detected anomalies in a few piles. Cross-hole Sonic Logging (CSL) testing was then performed on the anomalous piles to determine the extent of the anomalies. Based on the results of the CSL testing, Quincy and its geotechnical sub-consultant performed detailed analyses in order to confirm that each anomalous piles indeed has the required capacity.
This amendment will provide for the additional effort required for Task 10, "Construction Support", in order to analyze the anomalous piles. Caltrans has concurred with this amendment and associated costs are eligible for reimbursement. As a result of this amendment, the contract amount will be increased as indicated below by task and by bridge:
Summary by Task Additional Fee Not to Exceed
Task 10 - Construction Support (Robinson) $6,965.59

Summary by Bridge Additional Fee Not to Exceed
Anderson Creek Bridge at F...