File #: 19-960    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 9/25/2019 In control: BOARD OF SUPERVISORS
On agenda: 10/8/2019 Final action:
Title: Approve the rejection of all bids for the Soda Bay CSA-20 Redwood Water Tanks Replacement Project, Bid No. 19-12
Sponsors: Special Districts
Attachments: 1. Bid Tabulation
Title
Body
MEMORANDUM

TO: Board of Supervisors on behalf of CSA-20 Soda Bay water system
FROM: Jan Coppinger, Special Districts Administrator
DATE: October 8, 2019
SUBJECT: Approve the rejection of all bids for the Soda Bay CSA-20 Redwood Water Tanks Replacement Project, Bid No. 19-12

EXECUTIVE SUMMARY:
On June 19, 2019 the Soda Bay CSA-20 Redwood Water Tanks Replacement Project, Bid No. 19-12 was advertised. A pre-bid meeting was held on July 10, 2019 and bids were received no later than 3:30 p.m. on July 29, 2019. The project consists of replacing 4 redwood water tanks within the Soda Bay water system with bolted steel tanks and is grant funded through the FEMA Hazard Mitigation Grant Program (HMGP) at a 75% grant/25% match ratio. Total grant funding available is $720,000 with a local match of $240,000 for a total project cost of $960,000.
Engineering costs have been approximately $150,000 to date and construction management costs are anticipated to be between $80,000 and $100,000. Five bids were received and a bid tabulation is attached for your use. The bid documents were structured such that Tank #4 was identified as a deductive alternate allowing for flexibility in awarding the project if bids were higher than anticipated.
Unfortunately bids were significantly higher than the engineer's estimate; possibly due to contractor availability and tank scarcity related to recent wildfire events. Staff contacted CalOES to inquire after additional funding. Additional funding is not available, however CalOES is willing to work with the District to fund a reduced scope of work as long as the Benefit Cost Analysis (BCA) is greater than 1. As such, funding is not available to award the complete project as bid, or the reduced project without Tank #4.
In accordance with Article 19, "Evaluation of Bids and Award of Contract", subsection 19.1 of the Bid Documents staff recommends rejecting all bids. This will allow the project to be advertised again with...

Click here for full text