File #: 21-81    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 2/19/2021 In control: Planning Commission
On agenda: 2/25/2021 Final action:
Title: 9:05 A.M. - PUBLIC HEARING to Consider Major Use Permit (UP 20-18) and a Mitigated Negative Declaration based on Initial Study (IS 20-21). The Project Applicant is Incline Power LLC., Owner, Patsy Thorburn, is proposing a new 150’ tall cell tower and appurtenant equipment within an 80’ by 80’ fenced enclosure on 26.55+ acre property. Location: 16355 Highway 20, Clearlake Oaks, CA; and further described as APN: 010-055-31.
Sponsors: Community Development
Attachments: 1. UP 20-18 Incline Cellphone Tower Final, 2. Attachment 1 vicinity map, 3. Attachment 3 agency comments, 4. Attachment 3a Agency comment, 5. Attachment 4 conditions, 6. Attachment 5a drawings, 7. Attachment 5b photo sims, 8. Attachment 6 IS, 9. Attachment 7 letter of support
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Item 1
9:05 AM
February 25, 2021


STAFF REPORT

TO: Planning Commission

FROM: Scott DeLeon, Community Development Director
Toccarra Nicole Thomas, Community Development Deputy Director

Prepared by: Eric Porter, Associate Planner

DATE: February 25, 2021

RE: Incline Power; Major Use Permit (UP 20-18), and Initial Study (IS 20-21) 16355 S. Highway 20, Clearlake Oaks, and further described as APN: 010-055-31

Supervisor District 2: Bruno Sabatier
Planning Commissioner: Everardo Chavez

ATTACHMENTS: 1. Vicinity Map
2. Vacant
3. Agency Comments
4. Proposed Conditions of Approval
5. Site Plan, Telemetric Photos, Details
6. Initial Study IS 20-21
7. Letters of Support - Emergency Service Providers

I. EXECUTIVE SUMMARY

The applicant is requesting a major use permit for a new 150' tall cell tower on the subject site, along with an emergency generator and associated electrical equipment needed for the cell tower to function. The tower is regarded as a large tower at 150 feet in height. This project is for a new single lattice tower that will be capable of allowing co-located facilities on it. This application includes:
* 150' multi-function lattice tower
* One 80' by 80' multi-carrier compound (fenced enclosure)
* Four (4) 10' by 4' generator slabs
* Four (4) 15' by 20' carrier lease areas
* One (1) transformer on concrete pad
* One (1) 5' by 3' Telco vault
* One (1) 20' wide access gate with signage
* One (1) 6' tall fence around the 80' by 80' concrete pad / compound
* One (1) utility 'H-Frame'
* One (1) 80' wide utility and access easement
* Twelve (12) carrier antennas
The cell tower site is on a portion of the site that is relatively flat. There are high voltage lines located on the subject site. The tower site area is developed with a PG&E electrical tower and overhead lines, an access road, and ancillary equipment....