File #: 22-596    Version: 1 Name:
Type: Agreement Status: Agenda Ready
File created: 6/6/2022 In control: BOARD OF SUPERVISORS
On agenda: 6/21/2022 Final action:
Title: Approve Agreement Between the Kelseyville County Water Works District #3 and LACO Associates, Inc. for Engineering and Design Services for the Live Oak Drive Water Line Replacement Project for an Amount Not to Exceed One Hundred Thousand Six Hundred Ninety Five Dollars and No Cents ($100,695.00), and Authorize the Chair to Sign.
Sponsors: Special Districts
Attachments: 1. Design Services Contract Live Oak Dr Waterline Replacement - LACO Assoc. signed
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Memorandum


Date: June 21, 2022

To: The Honorable Lake County Board of Supervisors

From: Scott Harter, Special Districts Administrator

Subject: Approve Agreement Between Kelseyville County Waterworks District #3 and LACO Associates, Inc. for Engineering and Design Services for the Live Oak Drive Water Line Replacement Project for an Amount Not to Exceed One Hundred Thousand Six Hundred Ninety Five Dollars and No Cents ($100,695.00), and Authorize the Special Districts Administrator, Acting as the Assistant Purchasing Agent to Sign.

Executive Summary: The Live Oak Drive Water Line Replacement Project consists of the design and replacement of approximately 1,100 feet of existing water main along Live Oak Drive in Kelseyville, CA. The project will also include the replacement of water main stubs on Oak Street and a stub to the east approximately 130 feet north of Brotherson Street. The project will include replacement of all valves, hydrants and water services.

Engineering design will be fully funded by an IRWM (Integrated Regional Water Management) grant. A Request for Proposals was distributed to thirty (30) firms and we received two (2) proposals; LACO Associates, Inc. of Ukiah, CA and BKF Engineers of Santa Rosa, CA. A Consultant Selection Board (CSB) was convened in accordance with County policy and the recommendation of the CSB was to begin negotiations with the highest ranked firm, LACO Associates, Inc. Negotiations have completed and an agreeable scope and price has been identified and incorporated into the proposed agreement for services. Attached for your consideration is an agreement for the Engineering Design Services for the project.



If not budgeted, fill in the blanks below only:
Estimated Cost: ________ Amount Budgeted: ________ Additional Requested: ________ Future Annual Cost: ________

Consistency with Vision 2028 (check all that apply): ? Not applicable
? Well-being of Residents ? Public Safety ? Disaster Prevention, Preparedn...