File #: 22-667    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 6/20/2022 In control: BOARD OF SUPERVISORS
On agenda: 7/12/2022 Final action:
Title: Consideration of Amendment One to the Agreement between the County of Lake and SCS Engineers for Engineering Design Services for the Eastlake Landfill Expansion Project
Sponsors: Public Services
Attachments: 1. SCS Amendment One, 2. Phase 1 Construction Documents Proposal Addendum 5-26-22

Memorandum

 

 

Date:                                          July 12, 2022

 

To:                                          The Honorable E.J. Crandell, Chair, Lake County Board of Supervisors

 

From:                                          Lars Ewing, Public Services Director

 

Subject:                     Consideration of Amendment One to the Agreement between the County of Lake and SCS Engineers for Engineering Design Services for the Eastlake Landfill Expansion Project

 

Executive Summary:

 

In November 2021 the Board of Supervisors approved an agreement with SCS Engineers to complete engineering design services for phase one of the proposed Eastlake Sanitary Landfill expansion project. SCS Engineers was previously selected by a County consultant selection board as the most qualified firm to provide professional landfill expansion services. The scope of work of the current agreement includes preparation of facility permits, construction design documents, a construction quality assurance plan, and bid support tasks.

 

Staff has now identified two tasks necessary for project completion that were not included in the current agreement scope of work for SCS. First, the proposed location of the haul road requires a retaining wall design in order to ensure the road can be built in an appropriate location while maintaining required regulatory setback distances from the creek located to the east. Second, staff requested SCS prepare the project supplementary conditions, a.k.a. “Division One” specifications; currently only the preparation of project technical conditions, a.k.a. “Division Two” specifications, are in SCS’ original scope of work. To accomplish these two tasks, staff requested a proposal from SCS, which serves as the basis for this proposed amendment.

 

 

 

If not budgeted, fill in the blanks below only:

Estimated Cost:   Amount Budgeted:  Additional Requested: ________ Future Annual Cost: ________ 

 

Consistency with Vision 2028 (check all that apply):                                           Not applicable

Well-being of Residents                                           Public Safety                                                                Disaster Preparedness, Prevention, Recovery                     

Economic Development                                           Infrastructure                                                                 County Workforce                     

Community Collaboration                      Business Process Efficiency                      Clear Lake                                                               

If request for exemption from competitive bid in accordance with County Code Chapter 2 Sec. 2-38, fill in blanks below:

Which exemption is being requested?

How long has Agreement been in place? 

When was purchase last rebid?

Reason for request to waive bid?

 

Recommended Action:  Approve Amendment One to the Agreement between the County of Lake and SCS Engineers for Engineering Design Services for the Eastlake Landfill Expansion Project, and authorize the Chair to sign.